Case Study: 27% Cost Reduction through Cost Down Engineering in Cable Assembly
An automotive supplier tasked us with reducing the production costs of an existing high-voltage cable set. The product was already in series production, but margins were shrinking due to rising raw material prices. A new calculation was not feasible internally — so technical savings were required.
Analysis
Bill of materials: 47 individual components
3 variants due to minor configuration differences (connectors/crimping)
High proportion of manual labour (>60% of total costs)
No standardisation in cable lengths, cross-sections, or connector families
Actions
Redesigned for standardisation
Reduced to one connector family, aligned cable lengths
Replaced crimp terminals with IDC technology
Reduced assembly time by 34%
Integrated function wires
Combined two cable sets into one
Relocated pre-assembly
Moved to Eastern European facility (previously manual final assembly in Germany)
Result
- 27% lower production cost per cable set
- 50% fewer variants
- 30% shorter delivery time (due to reduced complexity)
- No loss of function—release by OEM without change approval process
Conclusion
Cost down engineering isn’t forced cost cutting—but systematic reassessment of established practice. Those who rethink value creation create room for margin—and maintain competitiveness.